Raven Oaks Subdivision – Winchester, VA

Project Description:  Subdivision for 143 homes with over 100,000 cy of dirt/topsoil to move, 7,500 lf of storm sewer, 9,000 lf of sanitary main and laterals, and 6,100 lf of water line.  also includes curb and asphalt paving.

ROBERT REGAN VILLAGE – Berryville, VA

Project Description: Sitework for 54,000 sf retirement village including grading, storm sewer, sanitary and water lines.  Curbing and asphalt paving are also included in scope.

Berryville Connexion Senior Living – Berryville, VA

Project Description:  Sitework for senior living facility.  Project consists of grading with rock removal, underground utilities, bioretention systems, concrete weir walls, site concrete, and asphalt paving. 

Lake Frederick Phase 1, Section 2A, Frederick County, VA

Project Description:  Sitework for 21 lots in subdivision.  Work consist of grading for basements, including rock free pads, site utilities, curbing, conduit crossing and road pavement.

THE VILLAGE AT ORCHARD RIDGE PHASE 2 – WINCHESTER, VA

Project Description:  Sitework for several buildings and connector road.  Consists of grading, rock free building pads, backfill basement with geofoam blocks, site utilities, site concrete, and asphalt paving. Very rocky site requiring removal while working near ex. buildings and ex. utilities .

Westminster Cantebury Addition, Winchester, VA

Project Description:  The project consists of several building additions to the existing facility.  We will encounter utility relocations, some in very tight spaces.  We will install a sanitary line in the courtyard which will mean going under the second level pedestrian crosswalk.  Considerable rock removal will be involved which will need to be hoe rammed.  […]

THE VILLAGE AT ORCHARD RIDGE PHASE 1B – WINCHESTER, VA

Project Description:  Sitework for cottages and roadway.  Consists of grading, rock free pads, utilities, site concrete, and paving.  .

Village at Orchard Ridge – Winchester, VA

Project Description:  Sitework for new retirement village including 4,000 lf of boulevard construction to new site, grading of 50 acre site,  site concrete and paving.  Also includes large storm water pond with geosynthetic clay liner.  Approximately 5 miles of underground utilites – storm, sanitary and water. 

Meadows Edge Phase 2 & 2A – Stephens City, VA

Project Description:   Complete site work for a 62 lot housing development including grading, site utilities and paving.

Meadows Edge Phase 3 & 3A – Stephens City, VA

Project Description:   Complete site work for a 69 lot housing development including grading, site utilities and paving.