SUBSTATION AT MILLBROOK – Winchester, VA

Project Description: Construction of substation for REC.  work consists of grading, storm sewer, and 5,000 sf segmental retaining wall.

FREDERICK DOUGLAS SCHOOL – Winchester, VA

Project Description: Reconstruction of existing elementary school with some demolition of existing facilities and installation of new utilities per current codes.  Includes construction of new stormwater pond in the location of rock outcropping.  Remainder of site work includes site concrete – curbing and sidewalk, and asphalt paving.

Access Road for Trex Office Building – Winchester, VA

Project Description:  Construction of access road to new Trex office building off Crossover Boulevard.  Work consists of minor grading, storm, sanitary and water installation, curbing and asphalt paving.

Heart and Vascular Entrance Improvements at WMC Hospital – Winchester, VA

Project Description:  Reconstruction of parking lot to provide better flow for handicap parking and pedestrian access to the entrance of the H&V building.  Work consists of demolition of the existing parking lot, new asphalt pavement, sidewalk and curbing.

SHIHADEH INNOVATION CENTER – Winchester, VA

Project Description:  Improvements to existing elementary school building to convert to a training facility for local students.  Work consists of small additions around the building, repairing the parking lot and installing new walkways and minor utilities.

MUSEUM OF THE SHENANDOAH VALLEY TRAILS – WINCHESTER, VA

Project Description:  Construction of approximately 10,000 lf of 8′ wide asphalt trail.  Project also includes 2 ea pedestrian bridges and a floaring walkway thru the wetlands.  Trail winds thru the perimeter property of the museum.  This project is part of the Green Trail system.  

NAVY FEDERAL BUILDING #1 RETROFIT – Winchester, VA

Project Description:  Improvements to existing building including excavating along existing building to remove and install new storm drainage system while keeping existing system with roof drainage operational.  Also in this ditch we will excavate for new canopy footings which are 7′ to 10′ wide, install electrical conduit system for canopies and then backfill to cover […]

FREDERICK WATER BALLFIELDS – Stephenson, VA

Project Description: Construction of five softball fields including grading, storm, sanitary, water utilities, infield mix, fencing and parking.

NAVY FEDERAL PH 2 TRAILS – Winchester, VA

Project Description: Construction of 3,200 lf of 6′ wide paved trails with 1,200 lf of retaining walls.  Work meanders thru woods and across streams. We are limited to 20 ft easement for construction.

WMC – CANCER CENTER PARKING LOT ADDITION – Winchester, VA

Project Description:  Construction of parking lot addition in existing swell.  Work consists of installing double run of 400 lf of 60” HDPE to reroute storm water.  Parking lot installed over piping.