Public Sector Projects

FREDERICK DOUGLAS SCHOOL – Winchester, VA

Project Description: Reconstruction of existing elementary school with some demolition of existing facilities and installation of new utilities per current codes.  Includes construction of new stormwater pond in the location of rock outcropping.  Remainder of site work includes site concrete – curbing and sidewalk, and asphalt paving.

SHIHADEH INNOVATION CENTER – Winchester, VA

Project Description:  Improvements to existing elementary school building to convert to a training facility for local students.  Work consists of small additions around the building, repairing the parking lot and installing new walkways and minor utilities.

MUSEUM OF THE SHENANDOAH VALLEY TRAILS – WINCHESTER, VA

Project Description:  Construction of approximately 10,000 lf of 8′ wide asphalt trail.  Project also includes 2 ea pedestrian bridges and a floaring walkway thru the wetlands.  Trail winds thru the perimeter property of the museum.  This project is part of the Green Trail system.  

CB VENTURES – Winchester, VA

 Project Description: Sitework for retail, restaurant and hotel.  Project consists of grading both onsite and within VDOT I-81 ROW.  Site utilities with offsite force main and gravity sewer, storm, and water.  Contract also includes site concrete, asphalt paving, and return topsoil and permanent seeding.

SACRED HEART GYM ADDITION – WINCHESTER, VA

Project Description:  Sitework for gym addition – involves relocating existing roadway, grading in small area onsite to achieve new building pad, and relocation of utilities. 

Shenandoah University Aspirational Village – Winchester, VA

Project Description:  Sitework for 2 ea buildings for student housing with associated parking.  Work includes grading, storm, sanitary, water, dry utilities, sidewalk, and paving.