Industrial & Warehousing

ONE LOGISTICS PARK PI PLAN – Winchester, VA

Project Description: Sitework of 124 acre site for Phase 1 industrial park – over 1,000,000 cy excavation.  Work also includes 10,000 lf of storm sewer, 2,000 lf of sanitary sewer, 6,000 lf of water line, underdrain system, 4 ponds with liners, site concrete, asphalt roadways and restoration.

ONE LOGISTICS PARK LOT 2 – Winchester, VA

Project Description: Sitework for 1 million sf building – 13,000 lf storm sewer, 3,000 lf sanitary sewer, 10,000 lf water lines, curbing and restoration.

MERCURY PAPER ADDITION – Strasburg, VA

Project Description: 93,600 sf building addition – work is in very rocky area and due to proximity of existing building, all rock will need to be hoe rammed.  minimum utility work.  additional concrete and asphalt paving for the new docks and trailer parking.

TREX BUILDING 6 – WINCHESTER, VA

Project Description:  Sitework for new 181,000 sf building.  Project consists of removing rock along shored walls for partial underground building, underground utilities including conduit system for relocating existing overhead power lines, site concrete and asphalt paving.