Lakeland Place – Phase 1 – Ranson, WVA

Project Description:  Complete site work for a 127 unit housing development, including four lane divided highway construction and detention basin, and box culvert installation with site utilities and conduit installation.

Wakeland Manor – Phase 2, 3, 4, 5, and 6 – Stephens City, VA

Project Description:  Grading, site utilities, site concrete and paving for several phases of subdivision in Stephens City.  Lot grading included in our scope and consisting of special grading for walkout and buried basements.

Channing Drive Phase 9 – Winchester, VA

Project Description:  Complete site work for a 149 unit housing development including grading, site utilities and paving

Shenandoah Development – Frederick County, VA

Project Description:  Reconstruction of Route 340/522, entrance road and complete site work for Phase 1 housing development.  Over 12 miles of utilities (storm, sanitary, and water).  Moved over 400,000 cy of dirt and rock for earthwork operations.

Fieldstone – Section 2 – Winchester, VA

Project Description:  Site development for townhouses including grading, storm drainage, sanitary and water, curbing and paving.

Lakeland – Phase 2 – Ranson, WVA

Project Description:  Road construction and lot rough grading for single family housing development

Spring Arbor of Winchester – Winchester, Va

Project Description:  Site preparation and development including building pad prep, site utilities, site concrete and paving.

Spring Arbor of Leesburg – Leesburg, VA

Project Description:  Site preparation and development including building pad prep, site utilities, site concrete and paving.

Frederick County Landfill CCD Area 1 PH 3 Liner & Entrance Road Drainage Improvements – Winchester, VA

Project Description:  Construction of erosion control measures for borrow area, construction of landfill cell, and installation of storm drainage along facility’s entrance road.

VDOT – Rt. 636 #(NFO)0636-021-152,M501 – Berryville, VA

Project Description:  Extend Mosby Boulevard and install roundabout at intersection with Route 7.  Completed six months ahead of schedule.  Included coordination with utility companies on relocation of ex. lines, maintaining safe driving lanes for public and completion of roundabout prior to school opening.