GRAYSTONE BUILDING 3 – Winchester, VA

Project Description:  210,000 sf warehouse building in same complex we did buildings 1 and 2 for same client. Project includes large storm sewer bypass line to divert run off water thru site.  Project includes 4,400 lf of storm sewer.  Typical warehouse construction including sanitary, water, concrete paving and asphalt paving.

GRAYSTONE SOUTH BUILDING 2 PHASE 2 – Winchester, VA

Project Description: Building addition consisting of undercutting unsuitable fill adjacent to existing building, hauling this material offsite and importing structural fill to replace undercut – approximately 20,000 cy of material.  Also includes permeable paver employee parking, storm drainage, new truck parking lot and restoration.

FREDERICK DOUGLAS SCHOOL – Winchester, VA

Project Description: Reconstruction of existing elementary school with some demolition of existing facilities and installation of new utilities per current codes.  Includes construction of new stormwater pond in the location of rock outcropping.  Remainder of site work includes site concrete – curbing and sidewalk, and asphalt paving.

Access Road for Trex Office Building – Winchester, VA

Project Description:  Construction of access road to new Trex office building off Crossover Boulevard.  Work consists of minor grading, storm, sanitary and water installation, curbing and asphalt paving.

Safe Employee of the Month – June 2021

Perry Engineering has chosen Glenn “Frankie” Combs as our Safe Employee of the Month. Frankie works as an excavator operator, employed 21 years, and was nominated by a foreman. The foreman wrote, “He keeps his equipment clean and greased, watches out for people and equipment around him. Frankie is an asset to the company.” Glenn […]

2021 National Trench Safety Stand Down Week – 2021

Perry Engineering participated in the National Trench Safety Stand-Down Week again this year with 30 employees among 6 utility crews. Trenching work is some of the most dangerous construction work performed. Nationwide in 2020 there were 21 workers killed and many others injured while performing trenching work. A safety stand-down is a time to stop […]

Safe Employee of the Month – May 2021

Perry Engineering has chosen Thomas Lambert Jr. as our Safe Employee of the Month. Tommy has worked for us for 22 years as a pipe crew heavy equipment operator. He was nominated by his foreman who wrote, “Tommy unloads pipe and other material, keeping it in an orderly fashion and chocking pipe to keep it […]

Safe Employee of the Month – April 2021

Perry Engineering has chosen Mark Propst as our Safe Employee of the Month. Mark is a pipe layer, employed 34 years with the Company. His foreman wrote, “Mark is very conscious of signs of an unmarked utility that may have been missed (by the utility locator). Always wears his personal protective equipment. Watches the way […]

2021 NATIONAL SAFETY STAND-DOWN TO PREVENT FALLS IN CONSTRUCTION

For the 7th year, Perry Engineering participated in the National Safety Stand-Down to Prevent Falls in Construction. Fatalities caused by falls from elevation continue to be a leading cause of death for construction employees. The National Safety Stand-Down raises fall hazard awareness across the country in an effort to stop fall fatalities and injuries. Perry […]

HOME BUILDERS ASSOCIATION OF VIRGINIA – 2020 BUILDERS MUTUAL SAFETY PROGRAM OF THE YEAR AWARD

Perry Engineering has been awarded the 2020 Builders Mutual Safety Program of the Year award through the Home Builders Association of Virginia. This is awarded to the builder or trade contractor who has developed, implemented and maintained a high-quality safety program. The judging criteria include: Quality of the company safety program Management’s involvement in the […]