PROJECTS

Project
Location
Contract Amount
Owner
Reference
Description

CENTRE AT HAGERSTOWN

Hagerstown, MD February 1999 - July 2000
$13,412,735
DDRC-PDK Hagerstown, LLC
Terry Richardson Petrie, Dierman, Kughn Suite 520, 1430 Springhill Road, McLean, VA 22101 (703)749-47500
Site grading of 413,00 cy along with construction of access roadway widening to Rt. 40, Rt. 48, and Int. 81; 12,500 lf of various storm drainage piping sizes 10" to 54"; 7714lf of sanitary sewer sizes 8" to 10" ; 9335lf of waterline ranging from 2" service to 12" main.
VDOT RT.33 - WEST MARKET STREET
Harrisonburg, VA July 1997 - March 2000
$18,341,255
Virginia Department of Transportation
Jeff Lineberry - Virginia Department of Vriginia, Inc. P.O. Box 509 Harrisonburg, VA 22801 (540)434-2586
Construct 1.8 miles of roadway including, 96,000 cy of grading, asphalt paving, traffic signalization, pavement marking, 16,000 lf of storm drainage piping, 17,400 lf of 24" DIP water main, 11,000 lf of water main sizes 4" to 18", and 5,500 lf of sanitary sewer main .
FREDERICK COUNTY LANDFILL CLOSURE A&B
Winchester, VA August 1999 - February 2000
$973,708
County of Frederick

Harvey Strawsnyder - Department of Public Work 107 North Kent Street Winchester, VA 22601 (540)665-5643

Installation of 18" clay liner, installation of landfill gas collection and control system, installation of 40 mil liner and composite geonet, final cap fill and grading on 1 acre closure.
CENTRE AT WINCHESTER - PHASE 1 & 2
Winchester, Virginia April 1998 - October 1999
$2,509,604
PDK - Winchester, LC
Phillip Ross - Petrie Dierman Kughn 1430 Springhill Road, Suite 520 McLean, VA 22102
Construction of 28 acre shopping center. Excavation, storm sewer, water line, fine grading, base stone, paving, retaining walls, topsoil return and seeding.
HARRISONBURG WALMART
Harrisonburg, VA February 1999 - January 2000
$2,698,551
Wyatt Development Company
Bo Murphy - Wyatt Development Company P.O. Box 6689 Aiken, SC 29804 (803)649-3975
Construction of shopping center including 114,000cy of excavation, 4,000sy of concrete paved ditc, construction of bridge, installation of utilities, paving, topsoil return & seeding.
LOWE'S
Winchester, VA February 1998 - December 1999
$2,655,123
Lowe's
Tom Petty KBS, Inc. 8050 Kimway Drive Richmond, VA 23228 (804)262-8657
Site work to construct new Lowe's store behind existing Lowe's store including demolition of existing store upon completion.

 

   
     